Standard Connection (in ground)
|
1. Loosen the stainless steel clamps. |
2. Slide Flexible Coupling over plain spigot ends of the two pipes. |
|
3. Tighten clamps to 60 inch-lbs. torque |
4. Pressure test before backfilling or concealing joint. Bed and backfill properly |



